S. 5074
Introduced in Senate · July 28, 2026July 22, 2026
Mr. Welch introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To amend the Federal Power Act to authorize the allocation of the costs of certain interstate electric power transmission lines and electric power transmission lines that are located offshore, and for other purposes.
Allocation of costs of certain transmission facilities
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
SECTION 1. Short title.
This Act may be cited as the “Enhancing Electric Grid Resilience Act”.
SEC. 2.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: