Missouri HB2537 modifies net metering provisions, setting capacity limits and detailing interconnection requirements.
Missouri HB2537 modifies net metering provisions by setting a limit on the total rated generating capacity of net metering systems at five percent of the retail electric supplier's single-hour peak load from the previous year. It mandates that net metering be available on a first-come, first-served basis until this limit is reached. The bill outlines specific requirements for interconnection, including safety standards and the need for a certification from a professional electrician or engineer.
Included in complete analysis
- Overview
- Core Provisions
- Implementation
- Impact
- Legal Framework
- Critical Issues
See what it does, who it affects, and the critical issues in plain language. Free, 30 seconds.