SB3529

MAKE-READY INFRASTRUCTURE ACT

Introduced·2/5/26
Introduced Text

Illinois SB3529 establishes rules for electric utilities to design and deploy electrical distribution infrastructure for electric vehicle charging.

The Make-Ready Infrastructure Rules Act requires electric utilities to propose a new rule authorizing the design and deployment of electrical distribution infrastructure for electric vehicle charging stations. This infrastructure, located on the utility side of the meter, is necessary for charging electric vehicles. The electric utility must recover its costs through periodic Multi-Year Integrated Rate Plan proceedings or other methods determined by the Illinois Commerce Commission.

Included in complete analysis

  • Overview
  • Core Provisions
  • Implementation
  • Impact
  • Legal Framework
  • Critical Issues

See what it does, who it affects, and the critical issues in plain language. Free, 30 seconds.

Where it stands

Current
Assignments Committee
Next
Committee decision

Sponsors

DD
2
0
Democratic CaucusRepublican Caucus

History

May 12

Senate

Added as Co-Sponsor Sen. Sara Feigenholtz

Apr 24

Senate

Rule 3-9(a) / Re-referred to Assignments

Mar 27

Senate

Rule 2-10 Committee Deadline Established As April 24, 2026