GRID Savings Act of 2026 aims to clarify Federal Energy Regulatory Commission jurisdiction over large load interconnections.
The GRID Savings Act of 2026 amends the Federal Power Act to clarify the Federal Energy Regulatory Commission's jurisdiction over the interconnection of large loads to the transmission system. It defines "covered large load" as a new or expanded nonresidential electric load with an aggregate peak demand of at least 150 megawatts. The Act mandates the Commission to issue a final rule establishing standards and procedures for interconnection, including timelines, readiness requirements, and study procedures.